TR · 2026
2900 mm Corten A EAF Primary Line Manufacturing and Installation Project
Izmir/AliagaFor our valued customer in Aliağa/İzmir, operating a 100-ton EAF with a 2,000,000 m³/h dust collection system, we manufactured a 2,900 mm diameter air-cooled primary line, installed upstream of the booster fan, entirely in Corten A steel at our own factory. The ATN Tech site team then dismantled the existing line and installed the new one at the customer's melt shop, successfully completing the project within three weeks.