TR · 2026
2900 mm Corten A EAF Primary Line Manufacturing and Installation Project
Izmir/AliagaFor our valued customer located in the Aliağa/İzmir region, operating a 100-ton EAF and a dust collection system with a capacity of 2,000,000 m³/h, the 2900 mm diameter air-cooled primary line (Corten A material) before the booster fan has been fully manufactured at our facility. Also the installation at the customer’s steel plant has been initiated by the ATN Tech site team and is progressing successfully. The dismantling of the existing line and the installation of the new line are expected to be completed within approximately 3 weeks.

